Translations:Betriebsregeltypen/28/en

Aus TALSIM Docs
Figure 8: Pool-based operating plan with two types of interpretation (selected month of May)
For the individual periods - here months - different functional dependencies between storage capacity and outflow are considered. If the storage volume/discharge relation is also considered for a selected point in time, there are two possibilities to connect the discharge nodes. On the one hand, there is the possibility of linear interpolation, and on the other hand, a step function is possible.