Translations:Betriebsplan/41/en

Aus TALSIM Docs

With the option Pool-based operating plan the reservoir storage during a year is subdivided in different zones (pools) each pool is associated with a fixed release level. Hence any amount of increasing release levels is defined and for each defined time period the reservoir storage for each release level is given. However, the option Pool-based operating plan is not restricted to described usage. Generally, any chosen x-value (usually: reservoir storage) can be transformed time-dependent into a y-value (usually reservoir release) via a pool-based operatin plan. The y-values of the supporting points are increasing and identical for every timestep.