Translations:Betriebsregeltypen/87/en
Version vom 26. November 2020, 17:02 Uhr von Ferrao (Diskussion | Beiträge) (Die Seite wurde neu angelegt: „* Practical example: :The water supply of Windhoek, the capital of Namibia, is provided by three dams. However, the withdrawal for drinking water supply is on…“)
- Practical example:
- The water supply of Windhoek, the capital of Namibia, is provided by three dams. However, the withdrawal for drinking water supply is only possible from one dam - Von Bach Dam. The remaining two reservoirs are connected to the main dam by pipes. However, the transfer volume between Swakopport Dam and Von Bach Dam is not exclusively available for refilling the Von Bach Dam, but also serves to supply the town of Karibib with drinking water.