Translations:Betriebsregeltypen/28/en

Aus TALSIM Docs
Version vom 24. März 2021, 15:35 Uhr von T.Schnellbach (Diskussion | Beiträge)
(Unterschied) ← Nächstältere Version | Aktuelle Version (Unterschied) | Nächstjüngere Version → (Unterschied)
Figure 8: Pool-based operating plan with two types of interpretation (selected month of May)
For the individual periods - here months - different functional dependencies between storage capacity and outflow are considered. If the storage volume/discharge relation is also considered for a selected point in time, there are two possibilities to connect the discharge nodes. On the one hand, there is the possibility of linear interpolation, and on the other hand, a step function is possible.