Translations:Betriebsregeltypen/26/en

Aus TALSIM Docs
Version vom 24. März 2021, 15:15 Uhr von T.Schnellbach (Diskussion | Beiträge)
(Unterschied) ← Nächstältere Version | Aktuelle Version (Unterschied) | Nächstjüngere Version → (Unterschied)
Figure 7: Pool-based operating plan with linear interpolation between successive time reference points
This view is practical but not yet complete: A three-dimensional representation of a simple pool-based operating plan makes this clear. On the X-axis is the time, on the Y-axis the storage capacity is plotted, while the Z-axis shows the output directed upwards.