Translations:Betriebsplan/38/en
Version vom 16. März 2021, 15:34 Uhr von T.Schnellbach (Diskussion | Beiträge)
For each (temporal) supporting point, values for x and y are entered. If, before the transformation, the system state value is smaller than the x-value, it is set to zero. If it is equal to or bigger than the x-value, it is transformed to the y-value. Every current date / time stamp constitutes which respective supporting point is then used for the transformation.