Translations:Betriebsplan/12/en

Aus TALSIM Docs
Version vom 16. März 2021, 13:39 Uhr von T.Schnellbach (Diskussion | Beiträge)
(Unterschied) ← Nächstältere Version | Aktuelle Version (Unterschied) | Nächstjüngere Version → (Unterschied)
A Current value Value is the current value without any modifications
F Function Value is transformed by applying a function
B Balance (with target) Value is used as a discrepancy from the target value in %
C Balance (without target) Value is calculated as a balance from several timesteps
Z Objective function Value is the result of an objective function
P Control gauge Currently disabled
S Sum Value is not a single value but is calculated as the sum of the system state