Translations:Betriebsplan/12/en

Aus TALSIM Docs
A Current Value Uses the current value without any modifications
F Function Value is transformed by applying a function
B Balance (with target) Value is used as a discrepancy from the target value in %
C Balance (without target) Calculates the balance of the value over several timesteps
Z Objective function Value is the result of an objective function
P Control gauge Currently disabled
S Sum Sum of the state instead of a single value