Translations:Transportstreckenfenster/13/en
Version vom 22. Dezember 2020, 16:32 Uhr von T.Schnellbach (Diskussion | Beiträge)
For the calculation of the transport reach as a pipeline, information on the diameter, the bottom gradient and the operating roughness are required. If a pipe with a non-circular cross-section is to be calculated, the hydraulic diameter and the profile area (cross-section area when fully filled) are specified instead of the circular diameter.