Translations:Einzugsgebiet/56/en
Version vom 25. November 2020, 14:43 Uhr von Froehlich (Diskussion | Beiträge)
Runoff concentration determines the delay of surface runoff from the catchment area. A parallel storage cascade with three reservoirs for permeable and one cascade for impermeable areas is used. The outflow of the components interflow and baseflow is output at the element outlet after passing through a single linear storage.