Translations:Berechnungsschema/ Implementierung der Betriebsregeln/20/en
Version vom 3. März 2021, 15:52 Uhr von T.Schnellbach (Diskussion | Beiträge)
If section changes are observed, the storage volume is known at every time t
. Consequently, processes depending on the storage volumes are also known. In general, the development of the curve over time is not required but rather the mean value within one time interval. If equation 2-4 is inserted into equation 2-1 and integrated over the inner time step length, the average process rate in the relevant time interval is obtained.