Translations:Transportstreckenfenster/13/en: Unterschied zwischen den Versionen
Keine Bearbeitungszusammenfassung |
Keine Bearbeitungszusammenfassung |
||
Zeile 1: | Zeile 1: | ||
For the calculation of the transport reach as a [[Special:MyLanguage/Transportstrecke#Freispiegel-Rohrleitung|pipeline]], information on the diameter, the bottom gradient and the operating roughness are required. If a pipe with | For the calculation of the transport reach as a [[Special:MyLanguage/Transportstrecke#Freispiegel-Rohrleitung|pipeline]], information on the diameter, the bottom gradient and the operating roughness are required. If the transport reach for a pipe with non-circular cross-section is to be calculated, the hydraulic diameter and the profile area (whole cross-section when fully filled) are specified instead of the circular diameter. |
Version vom 26. Januar 2021, 09:35 Uhr
For the calculation of the transport reach as a pipeline, information on the diameter, the bottom gradient and the operating roughness are required. If the transport reach for a pipe with non-circular cross-section is to be calculated, the hydraulic diameter and the profile area (whole cross-section when fully filled) are specified instead of the circular diameter.