Translations:Betriebsplan/12/en: Unterschied zwischen den Versionen
Keine Bearbeitungszusammenfassung |
Keine Bearbeitungszusammenfassung |
||
Zeile 2: | Zeile 2: | ||
|A | |A | ||
|Current Value | |Current Value | ||
| | |Uses the current value without any modifications | ||
|- | |- | ||
| | |F | ||
| | |Function | ||
| | |Value is transformed by applying a function | ||
|- | |- | ||
|B | |B | ||
|Balance (with target) | |Balance (with target) | ||
| | |Value is used as a discrepancy from the target value in % | ||
|- | |- | ||
|C | |C | ||
|Balance (without target) | |Balance (without target) | ||
| | |Calculates the balance of the value over several timesteps | ||
|- | |- | ||
| | |Z | ||
| | |Objective function | ||
| | |Value is the result of an objective function | ||
|- | |- | ||
| | |P | ||
| | |Control gauge | ||
| | |Currently disabled | ||
|- | |- | ||
|S | |S | ||
|Sum | |Sum | ||
| | |Sum of the state instead of a single value | ||
|} | |} |
Version vom 16. März 2021, 13:25 Uhr
A | Current Value | Uses the current value without any modifications |
F | Function | Value is transformed by applying a function |
B | Balance (with target) | Value is used as a discrepancy from the target value in % |
C | Balance (without target) | Calculates the balance of the value over several timesteps |
Z | Objective function | Value is the result of an objective function |
P | Control gauge | Currently disabled |
S | Sum | Sum of the state instead of a single value |