Translations:Betriebsregeltypen/25/en: Unterschied zwischen den Versionen
Ferrao (Diskussion | Beiträge) Keine Bearbeitungszusammenfassung |
Keine Bearbeitungszusammenfassung |
||
Zeile 1: | Zeile 1: | ||
* Mathematical abstraction: | * Mathematical abstraction: | ||
:[[Datei:Theorie_Abb6.png|thumb|Figure 6: Comparison of a pool-based operating plan in | :[[Datei:Theorie_Abb6.png|thumb|Figure 6: Comparison of a pool-based operating plan in a two- and three-dimensional representation]]As for the previous rules the output indeed depends on the storage volume. Usually, a pool-based operating plan is displayed in two-dimensional diagrams. The X-axis shows the time of one year, while the Y-axis shows the storage capacity. Pool-based operations are depicted as lines of equal outputs. |
Version vom 24. März 2021, 14:57 Uhr
- Mathematical abstraction:
- As for the previous rules the output indeed depends on the storage volume. Usually, a pool-based operating plan is displayed in two-dimensional diagrams. The X-axis shows the time of one year, while the Y-axis shows the storage capacity. Pool-based operations are depicted as lines of equal outputs.