All projects, scenarios and simulations are managed in the project manager. In order to be able to edit them, the correct [[Special:MyLanguage/Anschließen der Datenbanken|database]] must first be connected. From the [[Special:MyLanguage/Talsim-NG Hauptfenster|Talsim-NG main window]], the project manager can be accessed either via the [[Special:MyLanguage/Menüleiste|menu bar]] (''Talsim -> Project manager'') or the [[Special:MyLanguage/Symbolleisten|function bar]]. The latter is only possible if projects have already been created. | All projects, scenarios and simulations are managed in the project manager. In order to be able to edit them, the correct [[Special:MyLanguage/Anschließen der Datenbanken|database]] must first be connected. From the [[Special:MyLanguage/Talsim-NG Hauptfenster|Talsim-NG main window]], the project manager can be accessed either via the [[Special:MyLanguage/Menüleiste|menu bar]] (''Talsim -> Project manager'') or the [[Special:MyLanguage/Symbolleisten|function bar]]. The latter is only possible if projects have already been created. | ||
[[Datei:Benutzeroberfläche00016_EN.png]] [[ | [[Datei:Benutzeroberfläche00016_EN.png]] [[Datei:Benutzeroberfläche00018.png]] | ||
If no projects are available yet, an empty system administration opens: | If no projects are available yet, an empty system administration opens: |
Version vom 23. November 2020, 14:16 Uhr
All projects, scenarios and simulations are managed in the project manager. In order to be able to edit them, the correct database must first be connected. From the Talsim-NG main window, the project manager can be accessed either via the menu bar (Talsim -> Project manager) or the function bar. The latter is only possible if projects have already been created.
If no projects are available yet, an empty system administration opens:
If projects have already been created, they are displayed in the Project manager.
The system administration consists of the elements:
- Area variants (left)
- Area simulations (center)
- Area results (right)
- Menu Bar (top)
- Display of the active database and the active simulation (above, below menu bar)