Translations:Betriebsregeltypen/33/en: Unterschied zwischen den Versionen
Ferrao (Diskussion | Beiträge) Keine Bearbeitungszusammenfassung |
Keine Bearbeitungszusammenfassung |
||
Zeile 1: | Zeile 1: | ||
* Mathematical abstraction: | * Mathematical abstraction: | ||
:The determination of the discharge | :The determination of the additionally needed discharge is composed of several factors. Firstly, a volumetrically varying shortfall of water results from failing the target discharge. The shortfall of water is then implemented as a scaling factor to the discharge which can be defined by a function. The shortfall of water functions independently, while the scaling factor functions dependently. |
Aktuelle Version vom 24. März 2021, 16:34 Uhr
- Mathematical abstraction:
- The determination of the additionally needed discharge is composed of several factors. Firstly, a volumetrically varying shortfall of water results from failing the target discharge. The shortfall of water is then implemented as a scaling factor to the discharge which can be defined by a function. The shortfall of water functions independently, while the scaling factor functions dependently.