Translations:Betriebsregeltypen/39/en: Unterschied zwischen den Versionen
Keine Bearbeitungszusammenfassung |
Keine Bearbeitungszusammenfassung |
||
(Eine dazwischenliegende Version von einem anderen Benutzer wird nicht angezeigt) | |||
Zeile 1: | Zeile 1: | ||
* | * Dependency: [[Datei:Theorie_Abb11.png|thumb|Figure 11: Direct dependency between storage and control point]] | ||
:There is a direct dependency between the discharge from the | :There is a direct dependency between the discharge from the storage and the current inflow to the storage. Similar to the pool-based operating plan, there is also an adaptation to different inflow situations. This is done to prevent depletion or overflowing or to obtain a variable discharge regime downstream. However, long-term inflow fluctuations are difficult to detect with this operating rule, since the observations are only carried out as snapshots and not continuously. |
Aktuelle Version vom 30. August 2021, 11:27 Uhr
- Dependency:
- There is a direct dependency between the discharge from the storage and the current inflow to the storage. Similar to the pool-based operating plan, there is also an adaptation to different inflow situations. This is done to prevent depletion or overflowing or to obtain a variable discharge regime downstream. However, long-term inflow fluctuations are difficult to detect with this operating rule, since the observations are only carried out as snapshots and not continuously.