:[[Datei:Theorie_Abb8.png|thumb| | :[[Datei:Theorie_Abb8.png|thumb|Figure 8: Pool-based operating plan with two types of interpretation (selected month of May)]]For the individual time periods - here months - different functional dependencies between storage capacity and outflow are considered. If we also consider the storage contents/discharge relation for a selected point in time, there are two possibilities to connect the nodes of the discharge. On the one hand, there is the possibility of a linear interpolation, on the other hand, however, steps are also possible. |
Version vom 25. November 2020, 16:43 Uhr
- For the individual time periods - here months - different functional dependencies between storage capacity and outflow are considered. If we also consider the storage contents/discharge relation for a selected point in time, there are two possibilities to connect the nodes of the discharge. On the one hand, there is the possibility of a linear interpolation, on the other hand, however, steps are also possible.