Translations:Betriebsplan/42/en: Unterschied zwischen den Versionen
(Die Seite wurde neu angelegt: „By default the supporting points given by the user are interpreted as step values(?). However it is possible to interpolat in time and / or between the support…“) |
Keine Bearbeitungszusammenfassung |
||
(Eine dazwischenliegende Version von einem anderen Benutzer wird nicht angezeigt) | |||
Zeile 1: | Zeile 1: | ||
By default the supporting points | By default, the entered supporting points of the ''pool-based operating plan'' are interpreted similarly to a step function but in blocks. However, it is also possible to interpolate over time and / or interpolate linearly between the supporting points of x-/y-values.<br clear="all" /> |
Aktuelle Version vom 16. März 2021, 16:02 Uhr
By default, the entered supporting points of the pool-based operating plan are interpreted similarly to a step function but in blocks. However, it is also possible to interpolate over time and / or interpolate linearly between the supporting points of x-/y-values.